…
The drum is attached to the crane, the entire weight of the cable, drum and steel construction must be carried by the crane. For long travels (over 200m), several
…
A wide variety of cables are used in modern crane systems. The load due to constant movement is the same for all trolley and crane supply cables.
…
…roller chain
This very demanding crane application was specifically selected to test the P4.1 chain, with its tribologically optimized iglidur® plain bearings in the pin / bore connection of
…
…to the hoist on the crane girder via a control cable. In doing so, it can be moved along the crane girder independently of the hoist. This is to prevent…
…balancer) is generally used for large or harbour crane systems. Information on the drum solution can be found in the article entitled: Crane Main Power and Data Supply
Energy chain on…